Basic Workflow

  1. Create a new sequence

  2. Add the first measurement step to the table

  3. Test this step on the current image

    • Click on the button and draw the object to the image just as the operator will do.

    • If the check box in the Scheme column is selected, the object you draw now will be displayed in the measurement scheme (displayed by the Show Drawing button).

  4. Finish creating the sequence

    • Repeat the above steps to add all the measurement steps intended in the sequence and click the Test button.

    • Make sure the procedure works correctly. If needed, change the parameters in the table or use the button to modify the drawing of each step.

    • Click the Save button. The measurement sequence will be saved to an internal database under the name you define.

  5. Run the sequence